| Province | Subbasin | % |
|---|---|---|
| Columbia Cascade | Okanogan | 100.00% |
| Previous: | Next: |
|---|---|
| 73548 REL 11: 2007-224-00 EXP CCT METHOW RESTORATION |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Environmental Compliance Documentation | A: 165. Produce Compliance Documentation | 06/30/2019 | 06/30/2019 | |
| Methow Restoration Project Management | B: 119. Project Management | 06/30/2019 | 06/30/2019 | |
| Watershed coordination | C: 191. Methow Subbasin Coordination | 06/30/2019 | 06/30/2019 | |
| Prioritized Project List | D: 114. Project Identification and Selection Process | 06/30/2019 | 06/30/2019 | |
| Devany Side Channel/Instream Complexity Final Design | E: 175. Devany Side Channel/Aquatic Complexity Design | 06/30/2019 | ||
| Side Channel Re-connection | F: 30. Devany Side Channel | 06/30/2019 | ||
| Large wood instream structure | G: 29. Devany Aquatic Complexity | 06/30/2019 | ||
| Silver Reach Instream Enhancements Final Design | H: 175. Silver Reach Instream Enhancements Design | 06/30/2019 | ||
| Silver Reach Instream Structures | I: 29. Silver Reach Instream Enhancements Phase 2 | 06/30/2019 | ||
| Final Design for Mission Beaver Dam Analogs (Buttermilk Creek) | J: 175. Mission Beaver Dam Analogs (Buttermilk Creek) Design | 05/31/2019 | 10/01/2018 | |
| Beaver Dam Analogs | K: 29. Mission Beaver Dam Analogs (Buttermilk Creek) | 06/30/2019 | 06/30/2019 | |
| Livestock Exclusion | L: 40. Mission Livestock Exclusion (Buttermilk Creek) | 06/30/2019 | 06/14/2019 | |
| Final Design Mission Beaver Dam Analogs (Libby Creek) | M: 175. Mission Beaver Dam Analogs (Libby Creek) Design | 05/31/2019 | 10/01/2018 | |
| Beaver Dam Analogs | N: 29. Mission Beaver Dam Analogs (Libby Creek) | 06/30/2019 | 06/30/2019 | |
| Beavers relocated to the Methow basin. | O: 190. Beaver Relocation Project | 06/30/2019 | 06/30/2019 | |
| Maltais Irrigation Well | P: 82. Maltais Irrigation Well | 06/30/2019 | ||
| Elimination of Maltais Surface Diversion | Q: 84. Maltais Surface Diversion | 06/30/2019 | ||
| Outreach and Education in the Methow Valley | R: 99. Methow Valley Public Outreach | 06/30/2019 | 06/30/2019 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
| Coho (O. kisutch) - Unspecified Population |
|
| Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
| Trout, Bull (S. confluentus) (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Produce Compliance Documentation | 07/01/2018 | ||||||
| B | 119 | Project Management | 07/01/2018 | ||||||
| C | 191 | Methow Subbasin Coordination | 07/01/2018 | ||||||
| D | 114 | Project Identification and Selection Process | 07/01/2018 | ||||||
| E | 175 | Devany Side Channel/Aquatic Complexity Design | |||||||
| F | 30 | Devany Side Channel | |||||||
| G | 29 | Devany Aquatic Complexity | |||||||
| H | 175 | Silver Reach Instream Enhancements Design | |||||||
| I | 29 | Silver Reach Instream Enhancements Phase 2 | |||||||
| J | 175 | Mission Beaver Dam Analogs (Buttermilk Creek) Design | |||||||
| K | 29 | Mission Beaver Dam Analogs (Buttermilk Creek) | 08/28/2018 | ||||||
| L | 40 | Mission Livestock Exclusion (Buttermilk Creek) | 08/28/2018 | ||||||
| M | 175 | Mission Beaver Dam Analogs (Libby Creek) Design | |||||||
| N | 29 | Mission Beaver Dam Analogs (Libby Creek) | 08/28/2018 | ||||||
| O | 190 | Beaver Relocation Project | 07/01/2018 | ||||||
| P | 82 | Maltais Irrigation Well | 05/21/2019 | ||||||
| Q | 84 | Maltais Surface Diversion | |||||||
| R | 99 | Methow Valley Public Outreach | 07/01/2018 | ||||||
| S | 185 | Periodic Status Reports for BPA | 07/01/2018 | ||||||
| T | 132 | No report is required per COR | 07/01/2018 |